Testing & Commissioning

Inspection-ready T&C support — duct leakage, airflow balancing, equipment commissioning, punch-list rectification and handover documentation.

Testing and commissioning
T&C Scope

Structured Testing & Handover Support

Final testing and commissioning requirements follow approved project drawings, specifications, procedures and client requirements. Our technical team manages the complete process from pre-commissioning checks through to formal handover.

Testing Activities

  • Duct leakage testing and inspection
  • Airflow measurement and balancing (TAB)
  • Pressure and system testing
  • Refrigerant pressure testing and leak checks
  • Chilled water system flushing and pressure tests

Commissioning Activities

  • Equipment pre-commissioning checks
  • Functional testing and performance verification
  • Snagging and punch-list rectification
  • Commissioning records and data sheets
  • Handover dossier compilation

Testing & Handover Documents

  • Inspection and test records
  • Airflow check and TAB reports
  • Functional testing sheets
  • Punch-list and rectification tracking
  • Commissioning data sheets
  • As-built information
  • Agreed handover dossier

Calibrated Equipment Used

  • Calibration certificates maintained for all applicable instruments
  • Anemometers, manometers and pressure gauges
  • Leak detectors and vacuum gauges
  • Thermometers and clamp meters
  • Records provided on request

T&C Support for Your Project

Contact us with your project stage and commissioning requirements — we will coordinate the right technical team and documentation package.